
Single leaf 90 minutes, double leaf 60 minutes, also CE marked and Certifire certified for export projects.
See fire-rated doorsAll products, with filters
X-ray, CT, MRI RF, airtight theater and fire doors on one submittal set, one ID per door.
See healthcare doors
How to read what a certificate, listing or test report actually proves.
Read the guide
Engineering guides on sourcing, test evidence and every specialty door type, written by YK engineers.
Browse all articlesYK Door builds data center doors at four levels, from perforated rack doors and hot and cold aisle doors to fire-acoustic, flood and security doors for the building, for cloud, colocation and AI compute facilities and the OEMs that equip them.

Six views of one data center door set: the face, the hinge side, the open leaf, the hardware, the section and the door in service. Open any view full screen to see the detail.






Each type is engineered to the opening and verified on the route your project names.
| Model | Configuration | Performance | Standard |
|---|---|---|---|
| Project-engineered | Rack, aisle and building doors | Fire and acoustic to the specification | UL 10B/10C, EN 1634-1 |
Built to your opening size. Send the clear opening and wall type, and we confirm the leaf, frame and hardware with drawings.
Related products
A rack door looks simple, but a hole pattern 1 mm off can stop it fitting, and an open area 2% short changes airflow and heat rejection. We hold hole position with CNC punching and laser cutting, hold batch consistency with standard tooling and first-article approval, and design the lock, hinges, grounding and packaging for each customer. That is why rack and server OEMs use us as a batch supplier, with change control on every revision. For AI compute and energy storage cabinets that also need fire separation, see cabinet fire doors.

The documents behind the claims on this page, at the model and configuration that were assessed. Copies go with the submittal for your project.




UL listed and CE marked steel fire doors for data halls and plant rooms. See fire-rated doors.
For generator and chiller rooms next to occupied space. See acoustic doors.
Tested to ASTM E331 at 1,200 Pa for 30 minutes with no leakage. See flood doors.
Classified RC3 under EN 1627 for critical rooms. See security doors.
Want to see a certificate or talk through a schedule? Message our engineers directly.
WhatsApp +86 189 0371 1702[email protected]Contact formYes. We build front and rear rack doors to customer drawings with CNC punching and laser cutting, first-article approval and change control for batch supply.
Yes. One supplier can cover rack, aisle and building-level doors, with one submittal and one door ID per building opening.
Yes, with specialist thermal partners, designed to your heat load, water circuit and rack fit.
First-article approval, standard tooling and a frozen BOM, with change control on every revision and inspection records linked to each batch.
We deliver it with specialist thermal partners against your heat load, water quality, pressure drop and maintenance interface, with the responsibility split defined at the start.
For cabinet doors with fire separation, see AI compute cabinet doors.
| Model | Evidence | Number | Result | Size |
|---|---|---|---|---|
| YK-DC | Tested to IEC 60529 | SGS-CN-2025-IP-0731 | IP54; perforation 63 to 78% | Single door to 800×2200 mm; pair to 1600×2200 mm |
| YK-C40 | Classified to EN 12207 | SRIBS-2024-AC-0186 | Class 4 at +600 Pa | Single leaf to 1200×2400 mm |
| YK-S90 | UL 10B and UL 10C listed; cUL listed; WH listed | UL file E1753 (FD-10B-01, FD-10C-01); WHI20-286431 | 90 min single leaf, 60 min pair | Single leaf to 1200×2400 mm; pair to 2400×2400 mm |
Numbers are given as issued. See the full certificate register.
Rack doors to your drawings, in batches
Aisle doors and cage doors with fast installation
Building-level fire, acoustic, flood and security doors
Rear door heat exchanger shells with partners
The whole door package under one supplier
Built to customer drawings and IEC or ANSI rack accessory requirements, with hole pattern, open area and grounding stated.
Module interface, airflow and access control as shown.
To the project fire, acoustic and watertight standards for each opening.
To project requirements.
Heat load, pressure drop, water quality and maintenance interface defined.
First-article approval and change control for rack and aisle doors.
| Step | Rack and aisle doors | Building doors |
|---|---|---|
| Start | OEM drawing review | Door schedule and project specification |
| Approval | First article | Submittal against fire and acoustic specifications |
| Production | Tooling-based batches | Door by door, one ID each |
| Delivery | Packed to your takt time | Packed and labeled by opening |
| Handover | Batch records | Installation and acceptance records |
Send rack drawings or the building door schedule, and an engineer will reply with a configuration and batch plan. As a China specialty door manufacturer, we cover every door level in the data center.
Your files stay with our engineering team and are used only to prepare your quotation.