Gastight door with round vision panel in a laboratory corridor
Cleanroom doors

Biocontainment and Gastight Doors for Laboratories and Dry Rooms

YK Door builds gastight doors for rooms that must hold their air in or keep it out: BSL-2 and BSL-3 laboratories, animal rooms, decontamination areas and lithium battery dry rooms. Inflatable seals, airlock interlocks and defined power-failure and fire-alarm behavior are designed in from the start.

Inflatable sealsairlock interlockdisinfection compatiblelow dew point dry rooms
02 / Overview

How an inflatable seal works

Product views

Gastight doors and airlocks from every angle

Six views of one gastight doors and airlock set: the face, the hinge side, the open leaf, the hardware, the section and the door in service. Open any view full screen to see the detail.

1 / 6
Gastight door with round vision panel in a laboratory corridor
Stainless steel gastight door seen from the hinge side
Stainless steel gastight door shown open
Close-up of the stainless steel gastight door lever handle and lock
Cut-away section of a stainless steel gastight door showing the leaf core and frame
Stainless steel gastight door installed in a cleanroom
Models and sizes

Models, configurations and sizes

Each type is engineered to the opening and verified on the route your project names.

ModelConfigurationPerformanceStandard
Gastight, compression sealSingle; pairs per door set; airlock interlockWorking pressure and leakage rate to the projectPressure decay or tracer gas test
Gastight, inflatable sealSingle; pairs per door set; airlock interlockWorking pressure and leakage rate to the projectPressure decay or tracer gas test

Sizes and build

Opening
Built to the clear opening, pressure difference and seal type
Materials and finish
Steel or 304/316 stainless, twin compression or inflatable seals, powder coat, HPL or stainless
Other sizes

Built to your opening size. Send the clear opening and wall type, and we confirm the leaf, frame and hardware with drawings.

Single swingDouble swingSlidingPersonnel opening, single leafWide opening, double leaf or bi-parting

Related products

Compare in the product finder

03 / Product

Gastight door types

Configuration
Swing, double
What we design to
Biosafety level, airtightness, disinfection compatibility, interlock
Typical rooms
BSL-2 and BSL-3 labs, animal rooms

04 / Step by step

Interlock rules

01

Only one door of an airlock opens at a time.

02

A fire alarm overrides the interlock so people can leave.

03

An emergency stop releases the doors.

04

On power failure, the doors open in the way the safety plan defines.

05

Every state is signaled to the building system.

05 / Overview

Disinfection and cleaning

Containment rooms are cleaned and decontaminated often. We choose seal materials, coatings and joints for the agents and methods your facility uses, keep surfaces flush with no ledges where residue collects, and keep penetrations sealed. Our airtight construction is tested to EN 12207 Class 4 on the YK-C40 model, and the project's own leakage figure, pressure and measurement method set the target for each door.

06 / Overview

Dry rooms for battery production

Battery dry rooms run at a very low dew point. Every door opening lets moist air in. We use inflatable seals, low-permeability leaves and airlock logic to keep moisture out, and size the airlock to the opening frequency of the room.

07 / Facility

Where our gastight doors go

01Biosafety laboratories

Containment doors, airlocks, pass boxes

02Animal research facilities

Containment doors with interlocks

03Pharmaceutical and biotech plants

Inflatable seal doors on high-grade zones. See cleanroom doors.

04Lithium battery plants

Dry room doors and airlocks. See cabinet fire doors for energy storage.

05Hospitals

Isolation and negative-pressure rooms. See hermetic airtight doors.

Evidence

Certificates and test reports for gastight and biocontainment doors

The documents behind the claims on this page, at the model and configuration that were assessed. Copies go with the submittal for your project.

EN 12207 airtightness test report for YK Door cleanroom and airtight doors
EN 12207 · airtightness classification, cleanroom doorsets
FAQ

Gastight doors: questions buyers ask

Yes. Fire alarm takes priority over the interlock in our control scheme, so people can leave.

09 / Item

Gastight doors: the data sheet in one table

ItemSpecification
ConfigurationsSwing (single or double), sliding
SealsInflatable bladders, multiple seal lines, adjustable compression
Airtight constructionTested to EN 12207 Class 4 (YK-C40)
InterlocksTwo-door airlocks, pass boxes
Control priorityFire alarm and emergency stop override the interlock
Dry roomsLow-permeability leaves, airlock logic
FinishesFlush, sealed, disinfection-compatible
DocumentsControl state table, validation-ready documents

Evidence cards

YK-BS

Pressure decay tested biosafety door

Evidence
Tested to GB 19489 pressure decay criteria
Number
SRIBS-2025-BS-0117
Result
Pressure drop of 10% or less over 20 min at 500 Pa
Size range
Single leaf to 1200×2200 mm; pair to 2400×2200 mm
Construction
Stainless steel leaf; inflatable seal; interlock control

Numbers are given as issued. See the full certificate register.

10 / Term

Words that change a gastight door order

01Gastight

Very low leakage at a stated pressure

02Biocontainment

Keeping biological agents inside, with disinfection

03Dew point

The moisture level a dry room must hold

04Airlock

Two interlocked doors that are never open together

11 / Step by step

Writing a gastight door specification

01

Leakage

Leakage rate, pressure, direction and measurement method as scheduled.

02

Seals

Inflatable seals with pressure-loss protection where scheduled.

03

Interlock

Airlock doors interlocked, with fire alarm, emergency stop and power-failure priority.

04

Disinfection

Seals and surfaces compatible with the stated agents.

05

Documents

Control state table and documents suitable for validation.

12 / Condition

Control states

Condition

Normal

Action
One airlock door opens at a time
13 / Stage

Gastight door installation checks

01

Frame

What is checked
Sealed to the wall and floor
02

Seals

What is checked
Inflation, deflation and compression
03

Interlocks

What is checked
Every state in the control table tested
04

Leakage

What is checked
At the stated pressure, with the lab or cleanroom contractor
05

Records

What is checked
For the validation file
14 / Key points

Gastight door maintenance and spares

  • Inspect bladders and seals on the interval in the manual.
  • Test interlocks and the fire alarm release regularly.
  • Use only the approved disinfection agents on seals.
  • Order spare bladders and seals by door ID.
Request a quote

Send your containment spec

Send the containment level or dew point, pressures, leakage figure and room layout, and an engineer will reply with a configuration. Gastight doors are part of our airtight and cleanroom door range. Read about YK Door as a specialty door manufacturer in China.

1An engineer reviews each opening against its wall, standard and market.
2You receive a priced configuration per opening, or the questions that stand in the way.
3On approval, we send the English submittal with drawings, data sheets and an evidence index.

Ask for a specification review

Your files stay with our engineering team and are used only to prepare your quotation.

Scroll to Top